It starts with initiative and ends with touching hearts.

Steel Structure Specialized Contracting for the Jinan Henglong Plaza Project

Structural system: Steel-concrete composite structure and steel structure; the steel structure accounts for 12,000 tons.

Project Address: North of Quancheng Square, Jinan City

Structural Design: Maosheng Structural Consultants Co., Ltd.

Supervision Unit: Shandong Province Engineering Construction Supervision Company

Project Overview: The building integrates multiple functions, including a shopping mall, restaurants, cinemas, and parking facilities, with a total floor area of 277,000 m². Specifically, it features two underground levels, an eight-story shopping mall above ground, and a two-story auxiliary building. The building’s height reaches 50 meters.

Construction period: February 2009 – March 2011