It starts with initiative and ends with touching hearts.

Zhao Wang River Park, Heze City, Shandong Province – Great Wall Bridge Project

Project Location: Shandong, Heze

Project Overview: This project involves a cable-stayed bridge with a total of 12 bridge towers—8 Type A and 4 Type B. Each tower consists of three main components: the tower base, the tower body, and the tower crown. The tower body of each tower is 13.788 meters long and weighs up to 17.6 tons. After assembly, the overall height of each tower reaches 18.5 meters, with a maximum weight of approximately 83 tons.

Construction period: April 2010 – October 2010