Saudi YAMAMA Cement Plant Project
Total steel usage: 12,000 tons; Structural type: Steel frame structure
Project Overview: The largest structure—the preheating tower—measures 36.5 m in length, 21.9 m in width, and 164 m in height, with a single steel structure weighing 4,381 tons. The detailed design and node drawings were directly coordinated with ThyssenKrupp, and the project strictly adheres to U.S. standards for fabrication. In the field of industrial plant steel structures, the height of this building and the weight of its single steel structure are truly exceptional.
Construction period: September 2016 – December 2017
Contact Us
Company Address: China, Shandong, Liaocheng, High-tech Zone, Huanghe Road Science and Technology Building
Follow us
Copyright © 2025 Shandong Naishi Construction Engineering Co., Ltd.