Saudi YAMAMA Cement Plant Project

Total steel usage: 12,000 tons; Structural type: Steel frame structure

Project Overview: The largest structure—the preheating tower—measures 36.5 m in length, 21.9 m in width, and 164 m in height, with a single steel structure weighing 4,381 tons. The detailed design and node drawings were directly coordinated with ThyssenKrupp, and the project strictly adheres to U.S. standards for fabrication. In the field of industrial plant steel structures, the height of this building and the weight of its single steel structure are truly exceptional.

Construction period: September 2016 – December 2017