Pakistan Tal 2×330 MW CFB Power Plant Project

Total steel usage: 13,000 tons; Structural type: Steel frame structure. Project overview: This project is the Thar 2×330 MW CFB coal-fired power plant project in Pakistan. The current phase includes two 330 MW units, comprising the steel structure of Boiler No. 1 and the structural framework of Main Building No. 1. The thickest steel plate used in the boiler’s steel structure reaches 150 mm.

Construction period: October 2016 – December 2017